The Nigerian National Petroleum Company Limited says it is seeking to engage reputable and credible Operations and Maintenance companies, to operate and maintain the Warri Refining and Petrochemical Company and the Kaduna Refining and Petrochemical Company.
This was disclosed in a statement on Friday on its official social media handle.
The Warri refinery located at Warri in Delta State was commissioned in 1978. Warri is a complex conversion refinery with a nameplate distillation capacity of 6,250,000 MTA (125,000 bpd). The refinery complex includes a petrochemical plant commissioned in 1988 with production capacities of 13,000 MTA of polypropylene and 18,000 MTA of carbon black. The refinery is meant to supply markets in the south and southwest regions of Nigeria.
On its part, the Kaduna refinery was commissioned in 1980 to supply petroleum products to Northern Nigeria with a capacity of 50,000 B/D. In 1983, the capacity was expanded to 100,000 B/D by adding a second 50,000 B/D crude train dedicated to the production of lubricating oils (lubes). In 1986, the capacity of the first crude train was expanded to 60,000 B/D. The expansions have increased the current nameplate capacity of the refinery to 110,000 B/D.
Source:- Channelstv
Now Playing: Love Bug
Aretti Adi
SPONSORED LINKS
[CLICK HERE] Super Accurate 10 to 15 Odds Daily - See Here
[CLICK HERE] Get Your Daily Free Football Predictions With GG - Click Here
[CLICK HERE] For Music Artwork, Website Design And SEO Setup
INSTALL 9JAFLAVER MUSIC APP, STREAM, DOWNLOAD, AND PLAY MUSIC OFFLINE
CHECK OUT FUNNY PICTURE AND MEME HERE (CLICK HERE)
Chissom Anthony – Glory To God In The Highest [See Trending Gospel Song]
© 2014-2024 9jaflaver. All Rights Reserved.
About us | DMCA | Privacy Policy | Contact us
| Advertise| Request For Music | Terms Of Service
9jaflaver is not responsible for the content of external sites.