Abuja Residents Plunged Into Darkness Due To TCN Maintenance - 9jaflaver





Light Dark

WELCOME TO 9JAFLAVER

NEWS  |  MIXTAPE  |  INSTALL 9JAFLAVER MUSIC APP   |  HOTTEST 100 SONGS  |  SPORTS  |  CELEBRITY GIST  |  JOKES  |  COMEDY VIDEOS  |  NIGERIAN MUSIC ARTISTES  |  










Abuja Residents Plunged Into Darkness Due To TCN Maintenance

    Posted by on December 28, 2024,


SportyBet Ad

  Chat with Travel Loan Agent

Abuja Residents Plunged Into Darkness Due To TCN Maintenance



The Transmission Company of Nigeria (TCN) has announced planned power outages in parts of the Federal Capital Territory (FCT) on Saturday and Sunday due to maintenance work on transmission lines. Eyes Of Lagos reports,

In a statement released on Saturday, TCN’s General Manager of Public Affairs, Mrs. Ndidi Mbah, explained that the outages are necessary to enhance service delivery. She detailed the schedule, stating that Gwagwalada and surrounding areas will experience a power outage on Saturday, December 28, 2024, from 9 a.m. to 1 p.m., as engineers perform maintenance on a 60MVA power transformer and its associated switchgears at the Gwagwalada Transmission Substation.

On Sunday, December 29, 2024, from 9 a.m. to 1 p.m., another maintenance exercise will occur at the Kukwaba Transmission Substation. This will affect power supply in Wuye, EFCC, Federal Medical Centre, Coca-Cola, Idu Railway Station, Citec, and Life Camp.

Mrs. Mbah appealed for understanding, emphasizing that the maintenance is crucial for optimizing power equipment performance.

The statement reads:
“TCN wishes to inform the public of planned maintenance work at two transmission substations.

“On Saturday, December 28, 2024, between 9 a.m. and 1 p.m., maintenance will take place at the Gwagwalada 330/132/33kV Transmission Substation, resulting in a power outage in Gwagwalada and environs.

“On Sunday, December 29, 2024, from 9 a.m. to 1 p.m., maintenance will be conducted on one of the 60MVA transformers at the Kukwaba 132/33kV Transmission Substation, affecting power supply in Wuye, EFCC, Federal Medical Centre, Coca-Cola, Idu Railway Station, Citec, and Life Camp.”

TCN apologized for the inconvenience caused during this festive period, stressing the importance of the exercise for reliable power delivery.












Promote Music, Video, Comedy Skit & Advert
Call: +2348143945195

Whatsapp: +2348162075017 | Telegram: @naijaflavermedia )



REPORT A PROBLEM YOU ARE FACING ON THIS WEBSITE SO WE CAN FIX IT (CLICK HERE)















Comment Below:-

Enter Name Below (Optional)

         
Enter Comment Below:-



ATTENTION!! CAN'T FIND THE SONG YOU ARE LOOKING FOR? INSTALL 9JAFLAVER GO APP NOW TO GET ALL MUSIC, STREAM AND DOWNLOAD LEGALLY, AND LET YOUR FAVOURITE ARTISTS GET PAID ROYALTIES (CLICK HERE)


Promoted Songs
Great Mumbela


Song Artwork

Now Playing: Love Bug

Aretti Adi






DMCA.com Protection Status

Copyright © 2014-2025 9jaflaver. All Rights Reserved.


About us | DMCA | Privacy Policy | Contact us

| Advertise| Request For Music | Terms Of Service


9jaflaver is not responsible for the content of external sites.