See Map Of The Itakpe - Ajaokuta - Warri Rail Line - 9jaflaver





Light Dark

WELCOME TO 9JAFLAVER

NEWS  |  SOCCER LIVE-SCORE   |  MOVIES   |  +18 ADULT LEAKS   |   INSTALL 9JAFLAVER MUSIC APP   |  HOTTEST 100 SONGS  |  SPORTS  |  CELEBRITY GIST  |  MIXTAPE  |  JOKES  |  COMEDY VIDEOS  |  NIGERIAN MUSIC ARTISTES  |  







See Map Of The Itakpe – Ajaokuta – Warri Rail Line






ITAKPE-AJOKUTA-WARRI RAIL LINE

“The Itakpe-Ajaokuta-Warri rail line is passing through the following communities in Delta (Aladja, Urjevwu, Orhowhorun, Agbarho, Ovwori, Okpara Inland, Abraka and Urhonigbe), in Edo (Idumuesah, Ewossa, Agbor, Ekpon, Igbanke, Isanlu, Ekehen, Uromi, Ubiaja, Aigere, Uzanu and Agenebode) and in Kogi (Nashe, Ajaokuta Steel Complex, and Itakpe). I think the Federal Government needs to work with the LGs in these area on the site development and land-use planning for this corridor to prevent uncordinated haphazard development.

A future extension of the Itakpe-Ajaokuta-Warri line northwards by about 200km will take it through Lokoja, Abaji, Gwagwalada, Kuje up to Idu linking up with the existing Abuja-Kaduna line and the planned Kaduna-Kano line.

With the dredging of the River Niger from Bifurcation at Forcados up to Warri, it means in not too distant future, goods coming into Warri Port will find their way all the way to Lokoja, Abuja, Kaduna and Kano.

Onitsha is just about 70km east of Agbor, the design of the Second Niger Bridge has already been modified to include a rail line at the centre, this means with some additional effort, a 70km rail line will link Agbor and through the Second Niger Bridge to the main Market in Onitsha.

There is an existing unused rail bridge already between Ajaokuta and Itobe, with some effort (not up to 5km of rail), the main rail can be linked with the bridge into Kogi East (servicing nearby communities such as Idah, Ayangba, Dekina and Ankpa).

There is the Lagos-Calabar Coastal line (under project preparation) that will take off from around Shagamu along the on-going Lagos-Ibadan line, passing through Benin, Warri, Yenagoa, Port Harcourt, Aba, Uyo and Calabar.

There is the planned Kano-Maiduguri line passing Dutse, Potiskum, Damaturu and Maiduguri, which will be sequenced after the Kaduna-Kano line is completed.

There is also the Kano-Dawanau-Jibiya line passing through the Dawanau (the largest grains market in West Africa) and Jibiya to complete the LAKAJI corridor.

The government is negotiating for the contract of Port Harcourt to Maiduguri which is about 2,000 kilometres with a spur from Owerri through Nnewi and Awka and then from there to Abakiliki, while proceeding on to Gombe with a spur to Yobe, and through Yola, and then to Borno.

There is work going on. Let’s just be patient!”








Promote Article, Music, Video, Comedy Skit & Virals
Call: +2348143945195 Or +2349027283345

Whatsapp: +2348143945195


















Comment Below:-

Enter Name Below (Optional)

         
Enter Comment Below:-



ATTENTION!! CAN'T FIND THE SONG YOU ARE LOOKING FOR? INSTALL 9JAFLAVER GO APP NOW TO GET ALL MUSIC, STREAM AND DOWNLOAD LEGALLY, AND LET YOUR FAVOURITE ARTISTS GET PAID ROYALTIES (CLICK HERE)




Promoted Songs
Great Mumbela







DMCA.com Protection Status

© 2014-2024 9jaflaver. All Rights Reserved.


About us | DMCA | Privacy Policy | Contact us

| Advertise| Request For Music | Terms Of Service


9jaflaver is not responsible for the content of external sites.