Fashola Inspects Ongoing Construction Of 215MW Power Plant In Kaduna (See Photos)
Fashola is really out to shame his critics.Hon.Minister of Power, Works & Housing, Mr Babatunde Fashola, SAN today Wednesday July 13,2016 inspected the progress of work on the ongoing 215MW Power Plant in Kaduna State.He was conducted round the project by the Director of Rockson Engineering company Ltd, Mr Biyi Sangowawa and Kaduna State Governor, Malam Nasir El – Rufai during the inspection, verification and fact finding tour.
Now Playing: Love Bug
Aretti Adi
SPONSORED LINKS
🎬 [CLICK HERE] To Watch Thousands of Full Videos 100% FREE! Zero Ads, Instant Play, No Sign-Up. Play Directly on Your Browser or Use Our Data-Saving 0MB App!🍿
[CLICK HERE] For Music Artwork, Website Design And SEO Setup
INSTALL 9JAFLAVER MUSIC APP, STREAM, DOWNLOAD, AND PLAY MUSIC OFFLINE
CHECK OUT FUNNY PICTURE AND MEME HERE (CLICK HERE)
Chissom Anthony – Glory To God In The Highest [See Trending Gospel Song]
Copyright © 2014-2026 9jaflaver. All Rights Reserved.
About us | DMCA | Privacy Policy | Contact us
| Advertise| Request For Music | Terms Of Service
9jaflaver is not responsible for the content of external sites.