The power outage, which will run from 8 am to 6 pm daily, begins on October 11.

Lagosians in some residents would have to endure blackout for the next eight weeks.
The power outage, which will run from 8am to 6 pm daily, begins on October 11.
The Chief Technical Officer, Ikeja Electric (IE), Jide Kumapayi, who made this known in Lagos, explained that the reason is to enable the IE carry out an upgrade to the 132KVA conductors from Ogba to Ikeja.
He listed areas to be affected to include Oregun axis; Police Training College axis; Anifowoshe; Ojodu; Oba Akran; Magodo; Omole Phase 1 and Oke-Ira, among others.
Details shortly…
Now Playing: Love Bug
Aretti Adi
SPONSORED LINKS
LOAN FOR TRAVEL, VISA, JAPA, PoF UP TO N200M (CLICK HERE)
[CLICK HERE] For Music Artwork, Website Design And SEO Setup
INSTALL 9JAFLAVER MUSIC APP, STREAM, DOWNLOAD, AND PLAY MUSIC OFFLINE
CHECK OUT FUNNY PICTURE AND MEME HERE (CLICK HERE)
Chissom Anthony – Glory To God In The Highest [See Trending Gospel Song]
Copyright © 2014-2025 9jaflaver. All Rights Reserved.
About us | DMCA | Privacy Policy | Contact us
| Advertise| Request For Music | Terms Of Service
9jaflaver is not responsible for the content of external sites.