LCC Postpones Resumption Of Toll Collection At Lekki-Ikoyi Link Bridge

Daily Post reports that the Lekki Concession Company (LCC) has postponed the resumption of toll collection at the Lekki-Ikoyi link bridge.
This was confirmed in a statement by LCC Managing-Director director, Yomi Omomuwasan, on Friday.
Omomuwasan noted that the company will announce a new date soon.
LCC had suspended operations at the tollgate after the shooting incident during the #EndSARS protest in October 2020.
Toll collection was to resume on April 17, following the reopening of the toll plaza on April 1.
However, LCC has now suspended tolling and claimed it is to give residents more time to register for electronic toll devices.
“As a responsible organisation, we must take full cognizance of everyone within the axis. Therefore, we want to continue with the ongoing engagements with our stakeholders.
“The preparatory operations to resume tolling on the Bridge have been smooth so far, and we are grateful to all the key stakeholders for their cooperation.
“The planned commencement of toll collection has now been postponed, allowing more of our customers to register for the electronic toll devices to enable seamless passages at the toll plaza,” the statement read.
Now Playing: Love Bug
Aretti Adi
SPONSORED LINKS
LOAN FOR TRAVEL, VISA, JAPA, PoF UP TO N200M (CLICK HERE)
[CLICK HERE] For Music Artwork, Website Design And SEO Setup
INSTALL 9JAFLAVER MUSIC APP, STREAM, DOWNLOAD, AND PLAY MUSIC OFFLINE
CHECK OUT FUNNY PICTURE AND MEME HERE (CLICK HERE)
Chissom Anthony – Glory To God In The Highest [See Trending Gospel Song]
Copyright © 2014-2025 9jaflaver. All Rights Reserved.
About us | DMCA | Privacy Policy | Contact us
| Advertise| Request For Music | Terms Of Service
9jaflaver is not responsible for the content of external sites.