The Lagos State Government on Sunday noon announced the reopening of Third Mainland Bridge earlier than 7 pm scheduled time.
Recall that the Oworonshoki bound lane of the Third Mainland Bridge was closed totally from vehicular movement on midnight on Saturday, February 6, 2021, till 7 pm on Sunday, February 7, 2021, to remove the last expansion joint on the Oworonshoki bound lane.
In a statement released by Commissioner for Transportation, Dr Frederic Oladeindei, t was explained that the closure was vital to enable the contractor to move their equipment to the Oworonshoki bound lane within the given period without any interruptions that could be caused by vehicular movement on the bridge.
Explaining the closure, he stated that the rehabilitation process was being done assiduously to ensure set deadlines are met
Source:- Vanguard
SPONSORED LINKS
[TRENDING SONG!!] Romani D-Fans – Bestie (Prod By Krizbeatz)
[TRENDING MIXTAPE!!] DJ Baddo – Bestie Unlimited Mix
[TRENDING SONG!!] TYSG Ft Bad Mz X Kendi Rozzi – Iyariya
INSTALL 9JAFLAVER MUSIC APP, STREAM, DOWNLOAD, AND PLAY MUSIC OFFLINE
CHECK OUT FUNNY PICTURE AND MEME HERE (CLICK HERE)
Chissom Anthony – Glory To God In The Highest [See Trending Gospel Song]
© 2014-2023 9jaflaver. All Rights Reserved.
About us | DMCA | Privacy Policy | Contact us
| Advertise| Request For Music | Terms Of Service
9jaflaver is not responsible for the content of external sites.